Repair Area

Removing the crack left an opening about 400 mm deep and 300 mm wide in the rudder.

Welding

The cavity was rebuilt by hand with basic low-hydrogen MMA electrodes.

Build-Up

The weld rose about 30 mm per day over 15 to 17 days of continuous work.

Heating

The rebuilt section of the rudder was annealed after welding.

Checks

Visual, ultrasonic and penetrant testing of the repaired rudder showed no defects.

This content is blocked because it would connect to YouTube.

Scroll to Top