REFINERY
Refinery Process Piping
TIG welding of process piping and fuel networks in refinery and fuel installations, from 3/4 inch to 18 inch, in all positions and to qualified procedures.
Scope
Process piping and fuel networks in refinery and fuel installations.
- Refinery process piping
- Fuel networks
- 3/4 inch to 18 inch
- Many years on refinery sites



Welding
Every joint was welded with TIG to qualified procedures and plant rules.
- TIG (GTAW) welding
- Qualified procedures (WPS)
- Controlled heat input
- Clean, sound root pass



Positions
Welds made in all positions, including fixed pipe in tight plant areas.
- All welding positions
- Fixed pipe, 6G work
- Tight plant access
- Refinery safety rules



Qualified
Welder qualifications cover pipe work in all positions for refinery use.
- ASME IX 6G qualification
- EN ISO 9606-1
- Certificates for all positions
- Long refinery experience



Checks
Every weld was radiographed: 100% RT to the refinery requirements.
- 100% radiography (RT)
- Visual inspection (VT)
- Refinery quality standards
- Ready for service
This content is blocked because it would connect to YouTube.
Refinery Enquiries
Process piping, fuel lines or shutdown work in refineries: send drawings to plan the welding.
