Urgent Leak

A hull leak on a curved section, repaired afloat before a 6-hour departure deadline.

Divers

Commercial divers sealed the hull from outside so the repair could be welded dry.

Repair Weld

A doubler plate fitted to the curved shell, welded from inside and PT tested.

Result

Divers and welder worked as one team: the leak was closed on time, with 100% PT acceptance.

Commercial diver giving the all-clear on the quay after the hull leak repair
Scroll to Top