PIPELINE
TAP Pipeline
Welding on the 48-inch TAP high-pressure gas transmission pipeline, covering mainline joints and block valve station pipework to qualified procedures.
Project
A 48-inch onshore gas transmission line, around 878 km long, at about 95 bar.
- 48-inch onshore pipeline
- About 878 km in length
- Operating at about 95 bar
- Block valve stations



Root Pass
The root of each joint was welded with TIG or MMA, depending on the procedure.
- TIG root pass
- MMA root where specified
- Qualified procedures
- Tight fit-up tolerances



Fill & Cap
Fill and cap passes were welded with E8018 low-hydrogen basic electrodes.
- MMA (SMAW) fill and cap
- E8018 basic electrodes
- Multi-pass welding
- Controlled heat input



Teamwork
Two welders worked on each joint to keep pace with the pipeline schedule.
- Two welders per joint
- Root, fill and cap work
- High project requirements
- Mainline and station work



Checks
Penetrant and ultrasonic testing of the welds to the project requirements.
- Penetrant testing (PT)
- Ultrasonic testing (UT)
- Strict project standards
- Welds to project standard