Class Approval for Ship Repairs

class surveyor hull repair

Why Class Approval Is Needed

Most commercial ships are classed by a classification society, such as one of the members of IACS. The class certificate confirms that the ship’s structure and machinery meet the society’s rules, and it is required for insurance, flag state certificates and trading. When structural damage is repaired, the repair must be carried out to class rules and accepted by a surveyor, or the ship’s class can be suspended.

Before the Repair

Damage is first reported to the classification society, which sends a surveyor to attend. The repair method is agreed: crop and renew, insert plates, doublers as a temporary measure, or welding repairs of cracks. For complex or critical repairs, such as rudders, stern frames or main structural members, the repair procedure may need to be submitted and approved in advance.

ship in drydock

What Class Approval Covers

  • Repair procedure: method, sequence, joint designs and extent of renewal
  • Welding procedures: qualified to the society’s rules or recognised standards
  • Welders: holding valid qualification certificates for the processes and positions used
  • Materials: class-certified steel grades, such as A, AH36 or DH36, and approved consumables
  • Heat treatment: preheat and post-weld heat treatment where required
  • NDT: extent and method of testing, and acceptance criteria

During and After the Repair

The surveyor usually inspects fit-up before welding, may attend during critical stages, and examines the completed welds and NDT reports. Once satisfied, the surveyor records the repair, and any condition of class related to the damage can be deleted. If permanent repair is not possible immediately, a temporary repair may be accepted with a condition of class and a deadline.

hull insert plate welding

Common Pitfalls

Typical problems are starting work before the surveyor has agreed the method, using steel without proper certificates, welders whose qualifications have lapsed, and missing NDT records. Any of these can force the work to be redone or delay the ship’s departure, which costs far more than doing it right the first time.

From My Experience

I have carried out class-approved repairs, including on a cracked ship rudder where the procedure, preheat, welding and NDT were all agreed with the class society before the first weld. The surveyor’s sign-off at the end is what lets the ship sail, so every step is documented from the start.

steel plate certificate

Conclusion

Class approval makes sure that ship weld repairs restore the vessel to its rules, with approved procedures, qualified welders, certified materials and proper testing. See the ship rudder crack repair project and shipbuilding steel grades.

If you found this article useful, feel free to share it with colleagues who work with ship managers and superintendents. — Zisis

Need Help on a Project?

For marine repair welding on marine and industrial work, see Marine Repairs or request a quote.

Scroll to Top